Tuesday, December 25, 2007

Sheetrock

We stopped by the house before we went to Jackson for Christmas and they are really coming along with it. They are about ready to start painting!! They finished the outside of the house in the siding and it looks great!


Bottom floor of the deck-can't see the siding very well with all the stuff in the way.
A better picture
The kitchen
Living room
Stairs up
Master bedroom
Bathroom
Bigger picture of Kitchen
Bigger picture of Living room

Wednesday, December 12, 2007

Siding, Insulation and Sheetrock

This past week they had completed all but the front of the house with the siding and while Chris finished his wiring on the surround sound the guys were able to insulate the whole house! They had everything in the house and ready to begin sheetrock on Monday!
Fireplace wall with insulation and Chris's TV wires.
All the sheetrock and insulation for the downstairs.
The sheetrock and insulation for the upstairs
Winter-time big river view
Main water view from the top floor
Sunburst vent in the top.
"Back" of the house
Side
"Entry"
The Whole Picture


Monday, December 3, 2007

Plumbing and Siding

They have gotten almost one whole side done in the siding! They had to stop because TVA some how lost the feed to Clifton so NO ONE in Clifton had power for about 2 hours. But they have gotten the house in the dry so if it rains they can work on the inside till the outside gets done. They also started the plumbing!! We have showers and pipes everywhere! It's moving right along now!!
Siding almost done on this side.
They capped off the fire place!
Downstairs shower!
Where the potty is gonna go!
Upstairs shower